KiwiRail Bridge 7
Replacement of a timber, twin bridge with a four span steel bridge including:
• Bored piles 24m deep 1000mm in diameter
• Insitu concrete head stocks
• One abutment was pre cast, installed during a weekend block of line and one abutment was poured insitu
• The existing bridges were demolished and new Steel Plate Girder (SPG) bridge four spans installed over a 40 hour block of line
You might also like...
South Gippsland Highway– Level Crossing Removal
- SECTOR: Roads & Bridges, Rail, Construction
- LOCATION: Melbourne
The South Gippsland Highway, Dandenong South level crossing has been removed with a road bridge over the rail line opening months ahead of schedule in...
READ MOREFitzgerald Road, Ardeer and Robinsons Road, Deer Park – Level Crossing Removal
- SECTOR: Roads & Bridges, Rail, Construction
- LOCATION: Melbourne
Works have commenced to remove the dangerous and congested level crossings at Fitzgerald Road in Ardeer and Robinsons Road in Deer Park. These works will...
READ MOREEvans Road, Lyndhurst – Level Crossing Removal
- SECTOR: Rail, Roads & Bridges, Construction
- LOCATION: Melbourne
The level crossing at Evans Road, Lyndhurst was removed in October 2020 and replaced with a new road bridge. These works were delivered by Metropolitan...
READ MOREClyde Road, Berwick – Level Crossing Removal
- SECTOR: Rail, Roads & Bridges, Construction
- LOCATION: Melbourne
The level crossing at Clyde Road, Berwick is being removed by building a road underpass beneath the rail line. These works are being delivered by...
READ MORECardinia Road, Pakenham – Level Crossing Removal
- SECTOR: Roads & Bridges, Rail, Construction
- LOCATION: Melbourne
The level crossing at Cardinia Road, Pakenham was removed in December 2020, with traffic now safely travelling over the new road bridge. These works were...