SEARCH FOR PROJECTS
Ardmore Water Treatment Plant
- SECTOR: Water
- LOCATION: Auckland
Around 70 percent of Auckland’s water goes through the Ardmore water treatment plant. For Fulton Hogan this $25 million project on behalf of Watercare Services Limited is combining almost every aspect of work relating to water you can imagine. The programme is to increase resilience at the treatment plant to meet more stringent water treatment […]
READ MOREPrime Port Timaru Wharf
- SECTOR: Ports
- LOCATION: Christchurch
The Prime Port Timaru Wharf is approximately 330m long, and used as a multi-purpose bulk cargo, fishing and cruise vessel wharf. Prime Port has completed the upgrade of 217m of the replacement of decayed timber piles and beams, the construction of a new concrete deck, and the installation of greater capacity bollards and fandering system. […]
READ MORENorth Frame Pedestrian Bridge
- SECTOR: Roads & Bridges
- LOCATION: Christchurch
The North Frame Pedestrian Footbridge will span 32m across the Avon River in Central Christchurch, playing a key role in the total pedestrian experience of the Avon River Precinct Redevelopment Scheme. Supported by three, 20m deep concrete piles embedded into the dense gravel layer, the bridge construction required driving a 1.2m-diameter open-ended steel casing into […]
READ MOREKiwiRail Bridge 7
- SECTOR: Rail, Roads & Bridges
- LOCATION: Christchurch
Replacement of a timber, twin bridge with a four span steel bridge including: • Bored piles 24m deep 1000mm in diameter • Insitu concrete head stocks • One abutment was pre cast, installed during a weekend block of line and one abutment was poured insitu • The existing bridges were demolished and new Steel Plate […]
READ MOREWaiari Water Treatment Plant
- SECTOR: Water
- LOCATION: Tauranga
The Waiāri Water Supply Scheme involves developing a water abstraction facility on the Waiāri Stream, a water treatment plant in No.1 Road, Te Puke, and an underground water pipeline from the plant to Papamoa. The plant will mainly service the Papamoa coastal strip/Te Tumu growth areas and in time will provide a backup for Western […]
READ MOREAsphalting for Spirit of Tasmania’s New Quay in Geelong
- SECTOR: Ports, Roads & Bridges, Surfacing
- LOCATION: Corio Quay, north of Geelong
Construction of Spirit of Tasmania Quay in Corio, located north of Geelong, involved extensive construction works. It included rehabilitation works along Corio Quay Road, construction of new berthing and mooring infrastructure, civil works inside the port boundary, and construction of the new passenger terminal all the way to the water’s edge. Fulton Hogan was selected […]
READ MOREMount Ousley interchange
- SECTOR: Roads & Bridges
- LOCATION: Wollongong
The Mount Ousley interchange will replace the existing intersection of the Princes Motorway and Mount Ousley Road, improving connectivity, safety and efficiency to those travelling through the gateway to Wollongong. This project is jointly funded by the Australian and NSW Governments.
READ MOREOtira Gorge Reseal: A mountainous achievement
- SECTOR: Surfacing
- LOCATION: Otira Gorge, Arthur's Pass
The Otira Gorge is a classic example of a truly alpine environment. Towering rockfaces, vast scree slopes, and a sheer drop to the bottom of the valley. This section of State Highway 57 near Arthurs Pass boasts a gradient of up to 16 degrees as it tracks the river 60m below. Arguably one of the […]
READ MOREBerth P026 Hardstand
- SECTOR: Ports, Resources, Construction
- LOCATION: Port Hedland
Sandfire Resources exports its high value copper concentrate by hauling it in containers from their DeGrussa mine site to their export terminal at Port Hedland then loads it into ships. Fulton Hogan constructed the 1-hectare export terminal at Berth P026 in Port Hedland. Scope included earthworks, drainage, base works, and the use of an innovative […]
READ MORECraigieburn Road Upgrade
- SECTOR: Roads & Bridges, Construction
- LOCATION: Melbourne
Craigieburn Road is a critical link in Melbourne’s north, connecting approximately 28,000 vehicles between the Hume Highway and Mickleham Road per day. The project scope on Craigieburn Road between the Hume Highway and Mickleham Road includes: The addition of extra lanes in each direction Replacing the roundabouts with traffic lights at Mickleham Road, Waterview Boulevard […]
READ MOREDunedin City Council – SP8
- SECTOR: Roads & Bridges
- LOCATION: Dunedin
Dunedin City Council have been widening parts of Portobello Road since the early 2000’s. This is primarily to create space for pedestrians and cyclists with additional width and realignment for road user safety. The project consists of 16 separable portions, (SP’s), making it the largest roading package ever contracted by the Council. As this is one […]
READ MOREFrankton Marina
- SECTOR: Ports
- LOCATION: Queenstown
Fulton Hogan completed the land based civil works for the new Frankton Marina. Works include; sheet piling 150 metres of lake wall to a sheetpiled anchor wall, 500m3 of concrete pile capping, stormwater and wastewater works, fuel tank installation and 6,000m2 of asphalting for the carpark. The project involved forming groynes into the lake, to […]
READ MOREHallam Bypass
- SECTOR: Roads & Bridges, Construction
- LOCATION: Dandenong, Victoria
VicRoads awarded FRH Projects (now Fulton Hogan) three of the six contracts on the Hallam Bypass. Two of these contracts involved the design and construction of approximately three quarters of the Freeway, while the other contract was for the design and construction of an interchange. The project objective was to provide safe, continuous two-lane travel […]
READ MOREIMEX Intermodal Terminal 1
- SECTOR: Ports, Construction
- LOCATION: Sydney
Qube is developing the Moorebank Intermodal Logistics Park in Moorebank, Sydney, NSW. IMEX (Import-Export) IntermodalTerminal 1 – Construction was one of the packages of works that formed part of this project. It consisted of the construction of an open access import-export300,000m3 freight terminal. with a 250,000 TEU capacity (and with an ultimate capacity of up […]
READ MOREM&E – Metro Mechanical and Electrical Framework
- SECTOR: Water
- LOCATION: Adelaide
The Metro Mechanical and Electrical Framework includes design and construction of approximately 50 individual projects requiring mechanical and electrical renewal works, on assets such as pump stations, pressure reducing valves stations, rising mains and dosing stations that are located in the Adelaide metropolitan area and surrounding rural areas to south and north of the city. […]
READ MOREMidway Point Intersection Solution
- SECTOR: Roads & Bridges, Construction
- LOCATION: Sorell
Commissioned by the Department of State Growth, the Midway Point Intersection Project is a key part of the South East Traffic Solution, which will help improve safety and travel time reliability along the Tasman Highway between the Hobart Airport roundabout and the Arthur Highway south of Iron Creek Bridge. Fulton Hogan are managing the construction […]
READ MORENaseby Waste Water Filtration Beds
- SECTOR: Water
- LOCATION: Central Otago
Fulton Hogan were engaged by Central Otago District Council to construct new wastewater filtration beds in the township of Naseby. The innovative design by Stantec involved an automated fill and filter system to discharge the treated oxidation pond effluent to land. This replaces the previous discharge into the local creek. The beds also used crushed […]
READ MOREPetone to Melling Cycleway
- SECTOR: Roads & Bridges
- LOCATION: Wellington
The Petone to Melling Cycleway is being constructed as part of the wider Te Ara Tupua Cyleway between Wellington and the Hutt Valley heading North out of of Wellington. It will deliver a safe and efficient route between Wellington and the Hutt Valley for cyclists and pedestrians with connections to the regions existing walking and […]
READ MORERoute K Pedestrian Overbridge
- SECTOR: Roads & Bridges
- LOCATION: Tauranga
This project involved the supply and installation of a new 72m-long steel box truss pedestrian footbridge across Route K (Takitimu Drive) in Tauranga. The bridge connects cyclists and pedestrians as they travel between two suburbs, Bethlehem and Gate Pa. The three-span bridge is made up of a steel truss and two pre-cast concrete backspans. The […]
READ MORESir Tim Wallis Drive roundabout
- SECTOR: Roads & Bridges
- LOCATION: Wanaka
Sir Tim Wallis Drive roundabout gives access to the Wanaka Three Parks development. Three Parks is Central Otago’s newest community and commercial precinct, located just a short drive from the shores of Lake Wanaka. The roundabout construction included earthworks right through to the pavement surfacing, drainage work, kerbing, construction, sealing and asphalting, footpaths and signage. […]
READ MOREAdelaide Airport T2 Apron & Taxiway Overlay
- SECTOR: Airports, Construction, Surfacing
- LOCATION: Adelaide
Fulton Hogan saw this project as an ideal opportunity to utilise its proprietary binder JetBind® in the asphalt mix for the overlay.
READ MOREArraw Dam
- SECTOR: Resources, Water, Construction
- LOCATION: Cape York
Fulton Hogan is a renowned leader in building water storage for dams and reservoirs in challenging terrains.
READ MOREArthurs Lake Hydro
- SECTOR: Energy, Construction
- LOCATION: Midlands
The Arthurs Supply Pipeline Project was part of the Midlands Irrigation Scheme – Tasmania’s largest-ever infrastructure project.
READ MOREAuckland Motorway Alliance
- SECTOR: Asset Management
- LOCATION: Auckland
Established in October 2008, The Auckland Motorway Alliance (AMA), consisting of NZTA, Fulton Hogan, Opus, Beca, Resolve Group and Armitage Systems Ltd has been providing safe, efficient, and reliable maintenance to the Auckland Motorway network and SH22.
READ MOREAwakino Tunnel bypass
- SECTOR: Roads & Bridges
- LOCATION: Taranaki
Fulton Hogan are constructing the Awakino Tunnel bypass on the SH3 between Taranaki and King Country. This project consists of 2.3km of new road to bypass the historic one-way tunnel. The project includes two new bridges, three MSE recon block retaining walls, and approximately 200,000m3 of earthworks. The final product will include extensive riparian planting […]
READ MOREBayswater Level Crossing Removal
- SECTOR: Rail, Construction
- LOCATION: Melbourne
As part of Victoria’s Level Crossing Removal Program (LCRP), Fulton Hogan (with Laing O’Rourke and AECOM, in an alliance with Public Transport Victoria, Metro Trains Melbourne and VicRoads) undertook the removal of two grade separations at Mountain Highway and Scoresby Road in Melbourne’s outer east.
READ MOREBentley Chemplax Redevelopment
- SECTOR: Ports, Construction
- LOCATION: Melbourne
When the Port of Melbourne embarked on a major expansion, Fulton Hogan won a contract to build a new container stacking facility.
READ MOREBoondooma Dam
- SECTOR: Water, Construction
- LOCATION: South Burnett Region, Queensland
The spillway repairs project strengthened the existing spillway chute at Boondooma Dam.
READ MOREBulgana Wind Farm Balance Of Plant
- SECTOR: Energy, Construction
- LOCATION: Bulgana, Victoria
The 56 turbine wind farm spans over a 7,524-hectare site, which includes public roadsides and 14 private properties, primarily used for sheep grazing.
READ MORECentral Otago District Council Roading Physical Works Contract
- SECTOR: Asset Management
- LOCATION: Central Otago
Fulton Hogan retained this contract in 2016 for another 9 years. It covers 1,376km of unsealed roads, 509km of sealed roads, 176 bridges and 151km of footpaths.
READ MOREChristchurch Northern Corridor (CNC)
- SECTOR: Roads & Bridges, Construction
- LOCATION: Christchurch
In the first alliance of its size in the South Island, Fulton Hogan has teamed up with the NZ Transport Agency, Christchurch City Council, Aurecon and Jacobs to deliver the Christchurch Northern Corridor project.
READ MORECity of Port Phillip Civil Infrastructure Maintenance
- SECTOR: Roads & Bridges, Construction, Asset Management
- LOCATION: Port Phillip
Fulton Hogan has been providing maintenance and construction services to the City of Port Phillip Council for 21 years.
READ MORECivil Works – Australia Pacific LNG
- SECTOR: Resources, Construction, Ports, Energy
- LOCATION: Curtis Island
Fulton Hogan’s experience in earthmoving and civil construction was pivotal in meeting the challenges of the earthworks associated with a multi-billion dollar liquefied natural gas processing plant.
READ MORECleanaway Remediation
- SECTOR: Construction
- LOCATION: Melbourne
This project involves management of rehabilitation works at three hard waste landfill sites across Victoria containing fill such as concrete and asphalt.
READ MORECoastal Pathway (Shag Rock to Esplanade)
- SECTOR: Construction
- LOCATION: Christchurch
Fulton Hogan is completing a 720 metre long shared pathway in Sumner, Christchurch, to construct new seaside access for cyclists, pedestrians and other path users. The path is four metres wide and consists of a 120 metre long timber boardwalk and 600 metre long asphalt section, supported by a rock retaining wall. New GPS technology […]
READ MORECollaborative working – Pipelines (Sewerage and Drainage) Program Alliance
- SECTOR: Water
- LOCATION: Melbourne
The Pipelines (Sewerage and Drainage) Program Alliance was formed to design and construct new and replacement drainage and flood mitigation, sewerage transfer and drainage infrastructure works for Melbourne Water. The program ran in alliance with Fulton Hogan, Jaydo Construction, GHD and Melbourne Water. The Pipeline Alliance was responsible for the design and construction of over […]
READ MORECollaborative working – Collaborative RBP16 Frameworks
- SECTOR: Water
- LOCATION: Adelaide
Fulton Hogan delivers a series of four-year framework agreements consisting of individual projects, bundled according to geographical location or scope. Delivery of the frameworks is carried out in a collaborative, open and transparent way, with issues discussed and resolved jointly between the Fulton Hogan, SA Water and plant operators. The frameworks packages include: Glenelg WWTP […]
READ MOREDarlington Upgrade
- SECTOR: Roads & Bridges, Construction
- LOCATION: Adelaide
The Darlington Upgrade, being delivered by Gateway Upgrade – a joint venture between Fulton Hogan and Laing O’Rourke – is another important stage in the delivery of Adelaide’s north-south corridor.
READ MOREDunedin Airport – Gate 5 Extension
- SECTOR: Airports
- LOCATION: Dunedin
We are extending the existing apron to allow for increased aircraft capacity at Dunedin Airport. Part of this work includes the replacement of existing stormwater system and airfield lighting and installing a 1.2 metre wide pavement.
READ MOREEastern & South Western Maintenance Alliances
- SECTOR: Roads & Bridges, Asset Management, Surfacing
- LOCATION: Victoria
The Eastern Region Alliance (ERA) and South Western Region Alliance (SWA) are collaborative partnership arrangements between Fulton Hogan and VicRoads.
READ MOREEastern Access Road (Hawthorne Drive)
- SECTOR: Roads & Bridges, Construction
- LOCATION: Queenstown
Drivers travelling between Frankton and the Shotover River in New Zealand’s Queenstown now have an alternative route to travel after Fulton Hogan’s work on the Eastern Access Road.
READ MOREEdendale State Highway One realignment
- SECTOR: Roads & Bridges
- LOCATION: Edendale, Southland
Construction is currently underway on a new 2.6km realignment of State Highway One in Southland, bypassing the Edendale township and the Fonterra site. The alignment creates better highway connections between Invercargill and Gore and increases safety with heavy traffic diverted away from the local primary school and residential properties. The current section of highway has […]
READ MOREFibre-To-The-Curb (FTTC)
- SECTOR: Communications, Construction
- LOCATION: Melbourne
Fulton Hogan, in a strong partnership with the major Australian communications carrier, nbn Co Ltd, is delivering the innovative Fibre-to-the-curb (FTTC) technology to create connected communities across Melbourne, Victoria.
READ MOREFoxground & Berry Bypass
- SECTOR: Roads & Bridges, Construction, Surfacing
- LOCATION: Berry, New South Wales
This project on the south coast of New South Wales was a significant transport infrastructure investment for the region. It set a benchmark for the collaborative delivery of design and construct road projects in NSW and has attracted high praise from our client. It provides a four-lane highway with median separation for 12.5 kilometres of the Princes Highway between Toolijooa Road and just south of Andersons Lane.
READ MOREGlendowie Branch Trunk Sewer Upgrade
- SECTOR: Water
- LOCATION: Auckland
Fulton Hogan is carrying out the construction of the new 1km long x DN2100 storage tunnel. This includes a new 17m deep wastewater pumping station, six further manhole chambers along the main alignment, a new overflow structure, upgrades and connections to the live wastewater network. Additionally to this Fulton Hogan are demolishing the redundant infrastructure. […]
READ MOREHoddle Street Streamlining – Package B
- SECTOR: Roads & Bridges, Construction
- LOCATION: Melbourne
This project involves the design and construction of a ‘free flow interchange’ at Swan Street intersection on Hoddle Street and an upgrade of Brunton Avenue.
READ MOREHuntly Bypass
- SECTOR: Roads & Bridges, Construction, Surfacing
- LOCATION: Waikato
The Waikato Expressway is a key strategic transport corridor for the region that providing a four-lane expressway from Auckland to Cambridge. Fulton Hogan, as part of a JV with HEB, Jacobs and Opus International, delivered the Huntly Bypass section, which is a 15.2km stretch of road with nine bridges and two interchanges. After three seasons […]
READ MOREHunua 4
- SECTOR: Water, Construction
- LOCATION: Auckland
Fulton Hogan, in a joint venture with John Holland, constructed the majority of Hunua 4, the biggest water pipeline project in New Zealand’s recent history.
READ MOREKaikōura Emergency Works
- SECTOR: Rail, Construction
- LOCATION: Kaikōura
At Fulton Hogan, our international infrastructure specialists are known for our collaborative approach.
READ MOREKaikōura Marina
- SECTOR: Ports, Construction
- LOCATION: Kaikōura
Kaikōura Marina was almost destroyed by the 7.8 earthquake that struck the central region of New Zealand in November 2016
READ MOREKaimai Tunnel
- SECTOR: Rail, Construction
- LOCATION: Bay of Plenty
At Fulton Hogan, our international infrastructure specialists are known for our collaborative approach.
READ MOREFitzgerald Road, Ardeer and Robinsons Road, Deer Park – Level Crossing Removal
- SECTOR: Roads & Bridges, Rail, Construction
- LOCATION: Melbourne
Works have commenced to remove the dangerous and congested level crossings at Fitzgerald Road in Ardeer and Robinsons Road in Deer Park. These works will be delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, V/Line, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). The Robinsons Road […]
READ MOREClyde Road, Berwick – Level Crossing Removal
- SECTOR: Rail, Roads & Bridges, Construction
- LOCATION: Melbourne
The level crossing at Clyde Road, Berwick is being removed by building a road underpass beneath the rail line. These works are being delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). The project will also deliver an upgraded […]
READ MORESouth Gippsland Highway– Level Crossing Removal
- SECTOR: Roads & Bridges, Rail, Construction
- LOCATION: Melbourne
The South Gippsland Highway, Dandenong South level crossing has been removed with a road bridge over the rail line opening months ahead of schedule in August 2021. This project was delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). […]
READ MORECardinia Road, Pakenham – Level Crossing Removal
- SECTOR: Roads & Bridges, Rail, Construction
- LOCATION: Melbourne
The level crossing at Cardinia Road, Pakenham was removed in December 2020, with traffic now safely travelling over the new road bridge. These works were delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). More than 23,000 vehicles travelled […]
READ MOREEvans Road, Lyndhurst – Level Crossing Removal
- SECTOR: Rail, Roads & Bridges, Construction
- LOCATION: Melbourne
The level crossing at Evans Road, Lyndhurst was removed in October 2020 and replaced with a new road bridge. These works were delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). The project scope included: Constructing a shared use […]
READ MOREInland Rail Section 5: Parkes to Narromine (P2N)
- SECTOR: Rail
- LOCATION: Parkes, NSW
The Parkes to Narromine (P2N) section was the first of 13 sections on the Inland Rail Program to be completed. The P2N project involved upgrading 98.4km of existing rail track and construction of 5.3km of new rail near Parkes. Included in the project was the demolition of all existing infrastructure and a full rebuild of […]
READ MOREKUPE Gas Onshore Production Station Upgrade
- SECTOR: Energy, Construction
- LOCATION: North Island
The KUPE facility is a gas condensate field, located in the Taranaki basin, 30km off the west coast of New Zealand’s North Island.
READ MORELyttelton Pump Stations
- SECTOR: Water
- LOCATION: Christchurch
The Wastewater Lyttleton Project – Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to new pump stations as well as the construction of a new terminal pump station which is fed from the newly converted three pump stations.
READ MORELyttelton Wastewater Work Package 4
- SECTOR: Water
- LOCATION: Christchurch
Installation of 4.5 kilometre of wastewater pipeline connecting to the Lyttelton Harbour’s wastewater to an existing pump station (Pump Station 15) in Woolston’s Alport Place. This is the final stage of the four stage Lyttelton Harbour Wastewater Project. This project included thrusting under the railway line to install steel casing to protect the pipes from […]
READ MOREM&E – Metro Mechanical and Electrical Framework
- SECTOR: Water
- LOCATION: Adelaide
The Metro Mechanical and Electrical Framework includes design and construction of approximately 50 individual projects requiring mechanical and electrical renewal works, on assets such as pump stations, pressure reducing valves stations, rising mains and dosing stations that are located in the Adelaide metropolitan area and surrounding rural areas to south and north of the city. […]
READ MOREM80 Ring Road Upgrade
- SECTOR: Roads & Bridges, Construction, Surfacing
- LOCATION: Melbourne
This project entailed widening the M80 Freeway, including the 700m long E.J. Whitten Bridge, between Sunshine Avenue to Calder Freeway.
READ MOREMahinerangi Wind Farm
- SECTOR: Energy, Construction
- LOCATION: Dunedin
Fulton Hogan operates its own Heavy Haulage division that specialises in transporting large loads to difficult-to-access sites.
READ MOREMajor Cycle Routes
- SECTOR: Construction
- LOCATION: Christchurch
Fulton Hogan is one of the main contractors working to construct 13 major cycle routes across Christchurch. The cycle routes link different suburbs and provide easy access to business, residential and recreation areas. They also offer a safe transport option for cyclists, with many cycle routes separated from traffic with splitter islands. To date Fulton […]
READ MOREMaroon & Moogerah Dam Upgrade Works
- SECTOR: Water, Construction
- LOCATION: Maroon
This project involved the upgrade of both the Maroon and Moogerah Dams for Seqwater to improve flood security and address a number of dam safety concerns raised during dam safety reviews that had been conducted on the dams.
READ MOREMelbourne Tram Track Renewal
- SECTOR: Rail, Construction
- LOCATION: Melbourne
Fulton Hogan’s expertise in rail infrastructure construction and maintenance was applied to the renewal of 920 metres of double tram tracks on Melbourne’s iconic tram network.
READ MOREMidlands Highway – Epping Forest to Powranna
- SECTOR: Roads & Bridges, Construction
- LOCATION: Powranna
This project entails upgrading the highway to a 2 + 1 configuration between Belle Vue Road at Epping Forest and Powranna Road at Powranna (approximately 11km).
READ MOREMonash Freeway Upgrade
- SECTOR: Roads & Bridges, Construction, Surfacing
- LOCATION: Melbourne
This project’s key features included 30km of extra traffic lanes along with major improvements to the managed motorway system.
READ MORENational Aircraft Pavement Maintenance Programme 2014 – 2020
- SECTOR: Defence, Airports, Construction, Asset Management
- LOCATION: Australia
Fulton Hogan was re-engaged by the Department of Defence to perform various critical maintenance activities at military airfields across Australia for a further six years to 2020.
READ MORENBN South Australia Packages
- SECTOR: Communications, Construction
- LOCATION: Adelaide
Fulton Hogan is rolling-out multiple packages of FSAM (Fibre Servicing Area Modules) for the National Broadband Network (NBN) across Adelaide.
READ MORENew Airside Hardstand Construction
- SECTOR: Airports, Construction
- LOCATION: Auckland
Auckland Airport, the third busiest in Australasia, has experienced strong growth over the past five years. A continued forecast for growth in 2015 meant it urgently required a new hardstand for international aircraft.
READ MORENew Brighton Pier
- SECTOR: Roads & Bridges, Construction, Ports
- LOCATION: Christchurch
An 18 month long complex civil construction project was completed by Fulton Hogan in June 2018 with the repair and strengthening of New Brighton Pier.
READ MORENew Plymouth Wastewater Treatment Plant Upgrade
- SECTOR: Water, Construction
- LOCATION: North Island
Fulton Hogan used cutting-edge technology when appointed to carry out a recent stage of the New Plymouth Wastewater Treatment plant upgrade.
READ MORENorth Eastern Project Alliance
- SECTOR: Rail, Construction
- LOCATION: Rosanna
An Alliance has been formed between Fulton Hogan, Laing O’Rouke and Jacobs to deliver a program of works for the Level Crossing Removal Authority (LXRA).
READ MORENorth Island Cable Enhancement 4 (NICE4)
- SECTOR: Rail, Construction
- LOCATION: Waikato
At Fulton Hogan, our international infrastructure specialists are known for our collaborative approach.
READ MORENorthern Corridor Improvements (NCI)
- SECTOR: Roads & Bridges, Construction
- LOCATION: Auckland
Fulton Hogan has formed an alliance with the NZ Transport Agency, HEB Construction, Opus and Jacobs to deliver the $700 million Northern Corridor Improvements project.
READ MORENorthland Bridges – Matakohe & Taipa
- SECTOR: Roads & Bridges, Construction
- LOCATION: Northland
Fulton Hogan is constructing three new double lane bridges – two in Matakohe and one in Taipa- as part of the Government’s Northland Bridges programme.
READ MOREPeculiar Knob Haul Road
- SECTOR: Resources, Construction, Roads & Bridges
- LOCATION: Peculiar Knob
The client was experiencing a major problem with its 100km dirt haul road leading to its Peculiar Knob iron ore mine – it was unsafe and virtually unusable in wet conditions and had to be regularly graded.
READ MOREPIPELINES – Peninsula Eco Transfer Main
- SECTOR: Water
- LOCATION: Mornington Peninsula
Along the Mornington Peninsula between Rye and Portsea, more than 16,000 properties were reliant on septic tanks and onsite treatment plants to manage household sewage. Due to ageing, failing and poorly maintained septic tanks there was evidence of waste polluting groundwater, waterways and the environment in the region. To address this, Fulton Hogan (as part […]
READ MOREPort Botany Redevelopment
- SECTOR: Ports, Construction
- LOCATION: Sydney
Port Botany, now Australia’s largest container port, is a major commercial area, with multiple terminals. It is serviced by both road and rail, with the international and domestic airports nearby.
READ MOREProject Florence – Fonterra Wastewater Treatment Plant
- SECTOR: Water, Construction
- LOCATION: Waikato
When Fonterra was building its new milk powder plant in the Waikato, Fulton Hogan was brought in to construct a $20 million wastewater treatment plant.
READ MOREProject Lift, Gold Coast Airport
- SECTOR: Airports, Construction
- LOCATION: Gold Coast
Fulton Hogan drew on its vast experience in this sector to complete this complex project in time for the 2018 Gold Coast Commonwealth Games.
READ MOREPukekohe East Reservoir
- SECTOR: Water
- LOCATION: Auckland
Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.
READ MOREPukekohe Wastewater Treatment Plant Upgrade
- SECTOR: Water, Construction
- LOCATION: Pukekohe
Fulton Hogan carried out a $39 million upgrade to the Pukekohe Wastewater Treatment Plant to prepare for future population growth.
READ MORERAAF Pearce & Gin Gin Overlays
- SECTOR: Defence, Airports, Construction
- LOCATION: Perth
Fulton overlaid the runways and taxiways at RAAF Base Pearce and RAAF Base Gin Gin north of Perth for the Department of Defence.
READ MORERiccarton Road upgrade
- SECTOR: Roads & Bridges, Construction
- LOCATION: Christchurch
Upgrade of a section of Riccarton Road – one of Christchurch’s busiest road corridors. This project involved the replacement of more than 3400 metres of watermain, wastewater and stormwater piping, resurfacing 8000 square metres of pavement and installing new streetscaping. This challenging project included more than 1000 metres of wastewater pipes replacement at four metres, […]
READ MORERosedale WWTP Expansion – Liquid Stream
- SECTOR: Water
- LOCATION: Auckland
Watercare is expanding its Rosedale Wastewater Treatment Plant. This project includes a seventh Primary Sediment Tank (PST) and a MLE reactor, Biofilter expansion, Switchrooms, UV Upgrade, enabling works for Thermal Hydrolysis and an 11kv ring main installation.
READ MORESH36 Pedestrian Overbridge (Matarawa Pa overbridge)
- SECTOR: Roads & Bridges, Construction
- LOCATION: Tauranga
This project involved the supply and installation of a pedestrian footbridge over State Highway 36 in Tauranga, including piers, abutments, concrete walkway, swales, a 10m footbridge on the east side and other associated structural works. The bridge was a 38.3m steel frame truss with GEOTUB modular 900mm columns and 1200mm dia columns using steel column […]
READ MORESouth East Water Pipeline & Structures Program
- SECTOR: Water, Construction
- LOCATION: Melbourne
South East Water is a Melbourne metropolitan retail supplier, delivering potable water, recycled water and removing and managing wastewater from some 1.6 million people across their 3,640 km² network.
READ MORESouth West & Great Western Integrated Services Arrangement
- SECTOR: Roads & Bridges, Construction, Asset Management, Surfacing
- LOCATION: Bunbury
Fulton Hogan’s Integrated Service Agreement (ISA) with Main Roads Western Australia is an example of how we provide infrastructure management services on a long-term basis.
READ MORESouthern Apron Expansion (SEA), Tullamarine Airport
- SECTOR: Airports, Construction
- LOCATION: Melbourne
This project extended Fulton Hogan’s long-standing involvement at Tullamarine Airport. It was divided into two main areas of work, the Southern Apron Expansion and the Sierra Apron Infill.
READ MORETaramakau Bridge
- SECTOR: Roads & Bridges, Construction
- LOCATION: Greymouth
Fulton Hogan completed this 250 metre long bridge six months before the expected completion date, providing long-awaited travel improvements for drivers, cyclists and pedestrians.
READ MORETaxiway Alpha Widening & Strengthening
- SECTOR: Airports, Construction
- LOCATION: Christchurch
Christchurch International Airport continues to grow its position as New Zealand’s South Island hub. With the introduction of Airbus A380 aircraft, widening Taxiway Alpha in front of the terminal was required.
READ MORETaxiway Lima
- SECTOR: Airports, Construction, Surfacing
- LOCATION: Auckland
Auckland International Airport needed a new taxiway to accommodate the Airbus A380 aircraft, as well as reduce aircraft congestion and delays and improve safety at times of low visibility. Once constructed, this 600m-long 60m-wide taxiway doubled aircraft access from the busy international terminal to the main runway. Using Fulton Hogan’s multi-disciplinary engineering capabilities, the runway […]
READ MOREThe Waterways Alliance – Wetlands/irrigation/floodways
- SECTOR: Water
- LOCATION: Victoria
The Waterways Alliance formed between Fulton Hogan, Melbourne Water, Ecodynamics, and SMEC to deliver a multi-million-dollar program of new and upgraded waterway and wetland capital works. Projects and allocations that made up the Waterways Alliance Program were derived from Melbourne Water’s strategic objectives for waterways and stormwater quality with the long-term goal of ensuring that […]
READ MOREToorak Road West Tram Extension
- SECTOR: Rail, Construction
- LOCATION: Melbourne
As part of Melbourne Metro Tunnel enabling works, the Route 58 tram service which previously travelled along Domain Road and Park Street, South Yarra, was re-routed to Toorak Road West.
READ MOREWaimea Community Dam
- SECTOR: Construction
- LOCATION: Nelson
Fulton Hogan is joint venturing with Taylors Contracting on the Waimea Community Dam. A three-year project in the Lee Valley, 36km south-west of Nelson. The client, Waimea Water Ltd, is a joint venture between Tasman District Council and Waimea Irrigators Ltd. The dam is being developed after multiple droughts in the region over the past […]
READ MOREWastewater – Glenelg Wastewater Treatment Plant Inlet Screens & Anderson Ave Pump Station
- SECTOR: Water
- LOCATION: Glenelg
The D&C upgrade and rehabilitation of the WWTP was delivered as an ECI model to allow review and selection of the most appropriate equipment and construction methodologies and was delivered in two separable portions as follows: Glenelg WWTP Inlet Works (greenfields site adjacent to existing WWTP) Bulk earthworks and retaining wall construction Concrete structures construction […]
READ MOREWastewater – Mount Martha Sewer Treatment Plant (STP) Odour Control Facility
- SECTOR: Water
- LOCATION: Mt Martha
The Inlet Works Odour Upgrade was carried out as part of an ongoing SEW initiative to contain fugitive odour emissions from the inlet works, primary sedimentation tanks and anoxic tanks. The treatment of the odour was completed by the removal and upgrade of the existing Bio Trickling Filter (BTF) and associated ductwork. Fulton Hogan, as […]
READ MOREWater storage – Olympic Dam Potable 60ML + 80ML Dams Upgrades
- SECTOR: Water
- LOCATION: Olympic Dam, SA
Fulton Hogan has undertaken the design, construction and commissioning of all works associated with the 60ML and 80ML dam upgrades including civil, electrical, sump pump, piping, liner and cover works. Working in a remote, live mining environment has required a number of specialist processes to ensure worker safety as well as protection of significant geotechnical, […]
READ MOREWater storage – Werribee Aquifer Storage and Recovery Project
- SECTOR: Water
- LOCATION: Adelaide
The first of its kind in Victoria, the scheme involved pumping treated water from Werribee Salt Reduction Plant through a series of underground pipe networks into a below ground aquifer for future use by customers in Melbourne’s western suburbs. The bore field consisted of five 150m deep bores that allow water to be injected into […]
READ MOREWater Supply – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)
- SECTOR: Water
- LOCATION: Adelaide
The Hackney Road project section involved 2.2km of pipe relining, underboring, and complete replacement of various sections of pipeline. The pipe alignment ran through the East Parklands and crossed cultural and state heritage sites, requiring extensive stakeholder management and employing hydro-excavation methodologies to ensure significant tree protection during construction. The North East Road project section […]
READ MOREWater Supply – Naracoorte Water Supply Upgrade
- SECTOR: Water
- LOCATION: Naracoorte
This project included the design and construct of water supply network infrastructure that supplies 100% disinfected water to customers in the Naracoorte area, as part of SA Water’s Country Water Quality Improvement Program (CWQIP). SA Water undertook the concept design, and then Fulton Hogan completed a detail design before carrying out the water supply upgrade […]
READ MOREWellington International Airport Taxiway A Widening & Surfacing
- SECTOR: Airports, Construction
- LOCATION: Wellington
Recycling was an important focus during our work on the widening and resurfacing of Taxiway A at Wellington International Airport.
READ MOREWellington Network Outcomes Contract
- SECTOR: Asset Management
- LOCATION: Wellington
Capital Journeys is a joint venture between Opus and Fulton Hogan to deliver the road maintenance, renewals and asset management for the Wellington state highway network under NZTA’s Network Outcomes Contract (NOC) model.
READ MOREWestConnex – Operate & Maintain
- SECTOR: Roads & Bridges, Construction, Asset Management
- LOCATION: Sydney
WestConnex is the largest transport and urban renewal project in Australia and is a critical part of the NSW Government’s integrated transport solution, providing public transport and road infrastructure to ease congestion and keep Sydney moving. The Fulton Hogan Egis Joint Venture is responsible for the maintenance and operation of the motorway network including: Pavements […]
READ MOREWestern Belfast Bypass
- SECTOR: Roads & Bridges, Construction
- LOCATION: Christchurch
Part of the New Zealand roads of national significance programme, the Western Belfast Bypass project involved the construction of a new 5km, four-lane, median separated motorway to provide a direct connection between the Christchurch northern motorway and Johns Road. This project, which brought together a range of skills and experience from throughout Fulton Hogan, established […]
READ MOREWetlands/irrigation/floodways – Katfish Reach Hydrological and Fish Passage Structures
- SECTOR: Water
- LOCATION: Berri, Riverland
The Katfish Reach Hydrological and Fish Passage Structures project was a significant project, part of a joint Federal and State government initiative designed to improve the use of existing water resources in the area for the benefit of surrounding fauna and flora, improve hydrological connectivity, fish passage and general ecosystem health. Fulton Hogan’s scope was […]
READ MOREWetlands/irrigation/floodways – Riverine Recovery Project (RRP)
- SECTOR: Water
- LOCATION: Adelaide
The Riverine Recovery Project (RRP) forms part of the South Australian Riverland Floodplains Integrated Infrastructure Program (SARFIIP), a Commonwealth funded program to restore the health of the floodplains at Pike, Katarapko and the Riverland region. It is managed by the Department of Environment and Water in partnership with SA Water. Many years of water over-allocation […]
READ MOREWhite Rock Wind Farm
- SECTOR: Energy, Construction
- LOCATION: Northern New South Wales
Fulton Hogan worked with Goldwind to deliver a 175MW project near Glen Innes in the Northern Tablelands, New South Wales – a first for the business in this expanding area of the energy market.
READ MOREWhitsunday Coast Airport Runway Upgrade
- SECTOR: Airports, Construction, Surfacing
- LOCATION: Whitsunday
Whitsunday Coast Airport was the first project in Australia to achieve a zero waste status thanks to the innovative approach adopted by Fulton Hogan and the Council that saw the 2.1km runways upgrade at night, while planes still landed by day.
READ MOREWidening of Portobello Road
- SECTOR: Roads & Bridges, Construction
- LOCATION: Otago
Fulton Hogan is working on widening and raising the road between Broad Bay and Portobello as part of the Peninsula Connection project.
READ MOREWynyard Quarter Pump Station
- SECTOR: Water, Construction
- LOCATION: Auckland
Wynyard Quarter Pump Station is a critical asset required by Watercare to manage the wastewater generated by the extensive development in the Wynyard Quarter. The primary purpose of this project was to create a deep wet-well pumping station and 24 hour storage capacity for wastewater. The pump station required a control room to house the […]
READ MORE