Walnut Avenue Intersection Improvements

Walnut Avenue Intersection Improvements

  • CAPABILITY: Transport
  • LOCATION: Canterbury

Client: NZTA Waka Kotahi Duration: August 2021 – November 2022 Scope of Works: Walnut Avenue involved the upgrades of two roundabouts to signalised intersections, a new rail level crossing and improvements to pedestrian and cycling facilities. The scope of works included traffic signal, chamber and ducting installation, street lighting upgrades, stormwater basins, pavement and island […]

READ MORE
Fulton Hogan helps ready Wanaka for the future

Fulton Hogan helps ready Wanaka for the future

  • CAPABILITY: Three Waters
  • LOCATION: Otago

Fulton Hogan’s Civil division’s expansion of Wanaka’s wastewater treatment plant has helped ease the region’s growing pains. Involving heavy civil, mechanical, electrical and process works within live operations on one of Queenstown Lakes District Council (QLDC)’s critical water assets, the expanded plant is designed to meet 30 years of projected population growth in Wanaka, Albert […]

READ MORE
Expanding the scope of road monitoring in Wellington

Expanding the scope of road monitoring in Wellington

  • CAPABILITY: Maintenance
  • LOCATION: Wellington

Applying the ‘many hands make light work’ principle, Wellington Transport Alliance (WTA) is beginning to install electronic road surface monitoring cameras on vehicles other than specialist surveillance vehicles. WTA is an alliance of Waka Kotahi, Fulton Hogan and WSP, and maintains the state highways and roading networks of the Greater Wellington region. A camera has […]

READ MORE
Putting The Speed In Speed Tables

Putting The Speed In Speed Tables

  • CAPABILITY: Precast
  • LOCATION: Auckland

Pre-casting is changing the game in speed table construction.  This pre-cast speed table, installed for Auckland Transport in Kumeu by Fulton Hogan’s pre-cast team, Stevenson Concrete, Fulton Hogan Minor Construction and Coastline Markers, took a single overnight shift to install. This compares with the two weeks typically required for traditional in situ construction, thereby minimising […]

READ MORE
From blueprints to greenprints – our environmental crossroads in NZ construction

From blueprints to greenprints – our environmental crossroads in NZ construction

  • CAPABILITY:
  • LOCATION:

We Need to Talk About Kevin was a kick**** thriller about the stand-off between a mother and her troubled child. Possibly not on the same scale, but our New Zealand roading sector has a stand-off of a different kind playing out – and we certainly need to have some more mature conversations. I’m referring to the […]

READ MORE
SH25A project receives international recognition

SH25A project receives international recognition

  • CAPABILITY: Transport
  • LOCATION: Waikato

After featuring strongly in New Zealand industry awards, the SH25A Taparahi Slip remediation project in the Coromandel has gone a step further. It has been adjudged Bridge Project Team of the Year at the New Civil Engineer Conference Awards in London. Entered by Beca on behalf of the SH25A team – the Fulton Hogan/McConnell Dowell […]

READ MORE
New Waikato asphalt plant a sign of the future

New Waikato asphalt plant a sign of the future

  • CAPABILITY: Asphalt
  • LOCATION: Waikato

The first of Fulton Hogan’s four new Marini 2500 batch asphalt plants has been commissioned in the Waikato, as part of a major enhancement of the company’s asphalt production technology and capability across New Zealand. Producing up to 200 tonnes per hour, the new plant has almost three times the capacity of the existing plant, […]

READ MORE
NCI Project Nears Completion With A Flourish

NCI Project Nears Completion With A Flourish

  • CAPABILITY: Transport
  • LOCATION: Auckland

One of the final touches on the five-year Northern Corridor Improvements (NCI) project has also proved to be one of the more dramatic. A 30 shift (six week) project was completed in just 10 shifts by using three paving crews – running a milling, membrane and paving operation in parallel – to prepare for and […]

READ MORE
Lifting our national game on water infrastructure

Lifting our national game on water infrastructure

  • CAPABILITY: Three Waters
  • LOCATION: New Zealand

New Zealand is approaching the start of the first great water infrastructure renewal cycle in our history. Older countries, such as those in Europe, America, and parts of Asia, are already working their way through this cycle. Some have been through it multiple times, but as a young nation we are only approaching it now. […]

READ MORE
Te Ara Ihutai Christchurch Coastal Pathway

Te Ara Ihutai Christchurch Coastal Pathway

  • CAPABILITY: Community
  • LOCATION: Canterbury

Client: Christchurch City Council Duration: November 2021 – December 2023 Scope of Works: Separable Portion 1 – Western pathway works (build only) These works included construction of new rock revetment, pathway and a 4m asphalt path, some roading works (pedestrian crossing island and intersection modifications), demolition of an existing stone wall and construction/widening of an […]

READ MORE
SH73 Weedons Ross Road Intersection Improvements

SH73 Weedons Ross Road Intersection Improvements

  • CAPABILITY: Transport
  • LOCATION: Canterbury

Client: NZTA Waka Kotahi Duration: June 2022 – July 2023 Scope of Works: The scope of works included clearing of vegetation including a large block of established trees, stormwater and stock water race piping including basins, road widening, installing traffic signals and street lighting, pavement construction including the construction of a greenfield road and roundabout, […]

READ MORE