Lyttelton Wastewater Work Package 4
Installation of 4.5 kilometre of wastewater pipeline connecting to the Lyttelton Harbour’s wastewater to an existing pump station (Pump Station 15) in Woolston’s Alport Place. This is the final stage of the four stage Lyttelton Harbour Wastewater Project.
This project included thrusting under the railway line to install steel casing to protect the pipes from the trains passing and horizontal drilling under the Heathcote river to install 535m of the wastewater pipeline.
SHAREYou might also like...
Waiari Water Treatment Plant
- SECTOR: Water
- LOCATION: Tauranga
The Waiāri Water Supply Scheme involves developing a water abstraction facility on the Waiāri Stream, a water treatment plant in No.1 Road, Te Puke, and...
READ MORENaseby Waste Water Filtration Beds
- SECTOR: Water
- LOCATION: Central Otago
Fulton Hogan were engaged by Central Otago District Council to construct new wastewater filtration beds in the township of Naseby. The innovative design by Stantec...
READ MOREPukekohe East Reservoir
- SECTOR: Water
- LOCATION: Auckland
Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.
READ MORELyttelton Pump Stations
- SECTOR: Water
- LOCATION: Christchurch
The Wastewater Lyttleton Project - Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to...
READ MORERosedale WWTP Expansion – Liquid Stream
- SECTOR: Water
- LOCATION: Auckland
Watercare is expanding its Rosedale Wastewater Treatment Plant. This project includes a seventh Primary Sediment Tank (PST) and a MLE reactor, Biofilter expansion, Switchrooms, UV...
READ MORE