fbpx

SEARCH FOR PROJECTS

Berth P026 Hardstand

Berth P026 Hardstand

  • SECTOR: Ports, Resources, Construction
  • LOCATION: Port Hedland

Sandfire Resources exports its high value copper concentrate by hauling it in containers from their DeGrussa mine site to their export terminal at Port Hedland then loads it into ships. Fulton Hogan constructed the 1-hectare export terminal at Berth P026 in Port Hedland. Scope included earthworks, drainage, base works, and the use of an innovative […]

READ MORE
Craigieburn Road Upgrade

Craigieburn Road Upgrade

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Melbourne

Craigieburn Road is a critical link in Melbourne’s north, connecting approximately 28,000 vehicles between the Hume Highway and Mickleham Road per day. The project scope on Craigieburn Road between the Hume Highway and Mickleham Road includes: The addition of extra lanes in each direction Replacing the roundabouts with traffic lights at Mickleham Road, Waterview Boulevard […]

READ MORE
Dunedin City Council – SP8

Dunedin City Council – SP8

  • SECTOR: Roads & Bridges
  • LOCATION: Dunedin

Dunedin City Council have been widening parts of Portobello Road since the early 2000’s. This is primarily to create space for pedestrians and cyclists with additional width and realignment for road user safety. The project consists of 16 separable portions, (SP’s), making it the largest roading package ever contracted by the Council. As this is one […]

READ MORE
Hallam Bypass

Hallam Bypass

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Dandenong, Victoria

VicRoads awarded FRH Projects (now Fulton Hogan) three of the six contracts on the Hallam Bypass. Two of these contracts involved the design and construction of approximately three quarters of the Freeway, while the other contract was for the design and construction of an interchange. The project objective was to provide safe, continuous two-lane travel […]

READ MORE
IMEX Intermodal Terminal 1

IMEX Intermodal Terminal 1

  • SECTOR: Ports, Construction
  • LOCATION: Sydney

Qube is developing the Moorebank Intermodal Logistics Park in Moorebank, Sydney, NSW. IMEX (Import-Export) IntermodalTerminal 1 – Construction was one of the packages of works that formed part of this project. It consisted of the construction of an open access import-export300,000m3 freight terminal. with a 250,000 TEU capacity (and with an ultimate capacity of up […]

READ MORE
Midway Point Intersection Solution

Midway Point Intersection Solution

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Sorell

Commissioned by the Department of State Growth, the Midway Point Intersection Project is a key part of the South East Traffic Solution, which will help improve safety and travel time reliability along the Tasman Highway between the Hobart Airport roundabout and the Arthur Highway south of Iron Creek Bridge. Fulton Hogan are managing the construction […]

READ MORE
Adelaide Airport T2 Apron & Taxiway Overlay

Adelaide Airport T2 Apron & Taxiway Overlay

  • SECTOR: Airports, Construction, Surfacing
  • LOCATION: Adelaide

Fulton Hogan saw this project as an ideal opportunity to utilise its proprietary binder JetBind® in the asphalt mix for the overlay.

READ MORE
Arraw Dam

Arraw Dam

  • SECTOR: Resources, Water, Construction
  • LOCATION: Cape York

Fulton Hogan is a renowned leader in building water storage for dams and reservoirs in challenging terrains.

READ MORE
Arthurs Lake Hydro

Arthurs Lake Hydro

  • SECTOR: Energy, Construction
  • LOCATION: Midlands

The Arthurs Supply Pipeline Project was part of the Midlands Irrigation Scheme – Tasmania’s largest-ever infrastructure project.

READ MORE
Bayswater Level Crossing Removal

Bayswater Level Crossing Removal

  • SECTOR: Rail, Construction
  • LOCATION: Melbourne

As part of Victoria’s Level Crossing Removal Program (LCRP), Fulton Hogan (with Laing O’Rourke and AECOM, in an alliance with Public Transport Victoria, Metro Trains Melbourne and VicRoads) undertook the removal of two grade separations at Mountain Highway and Scoresby Road in Melbourne’s outer east.

READ MORE
Bentley Chemplax Redevelopment

Bentley Chemplax Redevelopment

  • SECTOR: Ports, Construction
  • LOCATION: Melbourne

When the Port of Melbourne embarked on a major expansion, Fulton Hogan won a contract to build a new container stacking facility.

READ MORE
Boondooma Dam

Boondooma Dam

  • SECTOR: Water, Construction
  • LOCATION: South Burnett Region, Queensland

The spillway repairs project strengthened the existing spillway chute at Boondooma Dam.

READ MORE
Bulgana Wind Farm Balance Of Plant

Bulgana Wind Farm Balance Of Plant

  • SECTOR: Energy, Construction
  • LOCATION: Bulgana, Victoria

The 56 turbine wind farm spans over a 7,524-hectare site, which includes public roadsides and 14 private properties, primarily used for sheep grazing.

READ MORE
Christchurch Northern Corridor (CNC)

Christchurch Northern Corridor (CNC)

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Christchurch

In the first alliance of its size in the South Island, Fulton Hogan has teamed up with the NZ Transport Agency, Christchurch City Council, Aurecon and Jacobs to deliver the Christchurch Northern Corridor project.

READ MORE
City of Port Phillip Civil Infrastructure Maintenance

City of Port Phillip Civil Infrastructure Maintenance

  • SECTOR: Roads & Bridges, Construction, Asset Management
  • LOCATION: Port Phillip

Fulton Hogan has been providing maintenance and construction services to the City of Port Phillip Council for 21 years.

READ MORE
Civil Works – Australia Pacific LNG

Civil Works – Australia Pacific LNG

  • SECTOR: Resources, Construction, Ports, Energy
  • LOCATION: Curtis Island

Fulton Hogan’s experience in earthmoving and civil construction was pivotal in meeting the challenges of the earthworks associated with a multi-billion dollar liquefied natural gas processing plant.

READ MORE
Cleanaway Remediation

Cleanaway Remediation

  • SECTOR: Construction
  • LOCATION: Melbourne

This project involves management of rehabilitation works at three hard waste landfill sites across Victoria containing fill such as concrete and asphalt.

READ MORE
Coastal Pathway (Shag Rock to Esplanade)

Coastal Pathway (Shag Rock to Esplanade)

  • SECTOR: Construction
  • LOCATION: Christchurch

Fulton Hogan is completing a 720 metre long shared pathway in Sumner, Christchurch, to construct new seaside access for cyclists, pedestrians and other path users. The path is four metres wide and consists of a 120 metre long timber boardwalk and 600 metre long asphalt section, supported by a rock retaining wall. New GPS technology […]

READ MORE
Darlington Upgrade

Darlington Upgrade

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Adelaide

The Darlington Upgrade, being delivered by Gateway Upgrade – a joint venture between Fulton Hogan and Laing O’Rourke – is another important stage in the delivery of Adelaide’s north-south corridor.

READ MORE
Eastern Access Road (Hawthorne Drive)

Eastern Access Road (Hawthorne Drive)

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Queenstown

Drivers travelling between Frankton and the Shotover River in New Zealand’s Queenstown now have an alternative route to travel after Fulton Hogan’s work on the Eastern Access Road.

READ MORE
Fibre-To-The-Curb (FTTC)

Fibre-To-The-Curb (FTTC)

  • SECTOR: Communications, Construction
  • LOCATION: Melbourne

Fulton Hogan, in a strong partnership with the major Australian communications carrier, nbn Co Ltd, is delivering the innovative Fibre-to-the-curb (FTTC) technology to create connected communities across Melbourne, Victoria.

READ MORE
Foxground & Berry Bypass

Foxground & Berry Bypass

  • SECTOR: Roads & Bridges, Construction, Surfacing
  • LOCATION: Berry, New South Wales

This project on the south coast of New South Wales was a significant transport infrastructure investment for the region. It set a benchmark for the collaborative delivery of design and construct road projects in NSW and has attracted high praise from our client. It provides a four-lane highway with median separation for 12.5 kilometres of the Princes Highway between Toolijooa Road and just south of Andersons Lane.

READ MORE
Hoddle Street Streamlining – Package B

Hoddle Street Streamlining – Package B

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Melbourne

This project involves the design and construction of a ‘free flow interchange’ at Swan Street intersection on Hoddle Street and an upgrade of Brunton Avenue.

READ MORE
Huntly Bypass

Huntly Bypass

  • SECTOR: Roads & Bridges, Construction, Surfacing
  • LOCATION: Waikato

The Waikato Expressway is a key strategic transport corridor for the region that providing  a four-lane expressway from Auckland to Cambridge. Fulton Hogan, as part of a JV with HEB, Jacobs and Opus International, delivered the Huntly Bypass section, which is a 15.2km stretch of road with nine bridges and two interchanges. After three seasons […]

READ MORE
Hunua 4

Hunua 4

  • SECTOR: Water, Construction
  • LOCATION: Auckland

Fulton Hogan, in a joint venture with John Holland, constructed the majority of Hunua 4, the biggest water pipeline project in New Zealand’s recent history.

READ MORE
Kaikōura Emergency Works

Kaikōura Emergency Works

  • SECTOR: Rail, Construction
  • LOCATION: Kaikōura

At Fulton Hogan, our international infrastructure specialists are known for our collaborative approach.

READ MORE
Kaikōura Marina

Kaikōura Marina

  • SECTOR: Ports, Construction
  • LOCATION: Kaikōura

Kaikōura Marina was almost destroyed by the 7.8 earthquake that struck the central region of New Zealand in November 2016

READ MORE
Kaimai Tunnel

Kaimai Tunnel

  • SECTOR: Rail, Construction
  • LOCATION: Bay of Plenty

At Fulton Hogan, our international infrastructure specialists are known for our collaborative approach.

READ MORE
Fitzgerald Road, Ardeer and Robinsons Road, Deer Park – Level Crossing Removal

Fitzgerald Road, Ardeer and Robinsons Road, Deer Park – Level Crossing Removal

  • SECTOR: Roads & Bridges, Rail, Construction
  • LOCATION: Melbourne

Works have commenced to remove the dangerous and congested level crossings at Fitzgerald Road in Ardeer and Robinsons Road in Deer Park. These works will be delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, V/Line, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). The Robinsons Road […]

READ MORE
Clyde Road, Berwick – Level Crossing Removal

Clyde Road, Berwick – Level Crossing Removal

  • SECTOR: Rail, Roads & Bridges, Construction
  • LOCATION: Melbourne

The level crossing at Clyde Road, Berwick is being removed by building a road underpass beneath the rail line. These works are being delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). The project will also deliver an upgraded […]

READ MORE
South Gippsland Highway– Level Crossing Removal

South Gippsland Highway– Level Crossing Removal

  • SECTOR: Roads & Bridges, Rail, Construction
  • LOCATION: Melbourne

The South Gippsland Highway, Dandenong South level crossing has been removed with a road bridge over the rail line opening months ahead of schedule in August 2021. This project was delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). […]

READ MORE
Cardinia Road, Pakenham – Level Crossing Removal

Cardinia Road, Pakenham – Level Crossing Removal

  • SECTOR: Roads & Bridges, Rail, Construction
  • LOCATION: Melbourne

The level crossing at Cardinia Road, Pakenham was removed in December 2020, with traffic now safely travelling over the new road bridge. These works were delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). More than 23,000 vehicles travelled […]

READ MORE
Evans Road, Lyndhurst – Level Crossing Removal

Evans Road, Lyndhurst – Level Crossing Removal

  • SECTOR: Rail, Roads & Bridges, Construction
  • LOCATION: Melbourne

The level crossing at Evans Road, Lyndhurst was removed in October 2020 and replaced with a new road bridge. These works were delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). The project scope included: Constructing a shared use […]

READ MORE
KUPE Gas Onshore Production Station Upgrade

KUPE Gas Onshore Production Station Upgrade

  • SECTOR: Energy, Construction
  • LOCATION: North Island

The KUPE facility is a gas condensate field, located in the Taranaki basin, 30km off the west coast of New Zealand’s North Island.

READ MORE
M80 Ring Road Upgrade

M80 Ring Road Upgrade

  • SECTOR: Roads & Bridges, Construction, Surfacing
  • LOCATION: Melbourne

This project entailed widening the M80 Freeway, including the 700m long E.J. Whitten Bridge, between Sunshine Avenue to Calder Freeway.

READ MORE
Mahinerangi Wind Farm

Mahinerangi Wind Farm

  • SECTOR: Energy, Construction
  • LOCATION: Dunedin

Fulton Hogan operates its own Heavy Haulage division that specialises in transporting large loads to difficult-to-access sites.

READ MORE
Major Cycle Routes

Major Cycle Routes

  • SECTOR: Construction
  • LOCATION: Christchurch

Fulton Hogan is one of the main contractors working to construct 13 major cycle routes across Christchurch. The cycle routes link different suburbs and provide easy access to business, residential and recreation areas. They also offer a safe transport option for cyclists, with many cycle routes separated from traffic with splitter islands. To date Fulton […]

READ MORE
Maroon & Moogerah Dam Upgrade Works

Maroon & Moogerah Dam Upgrade Works

  • SECTOR: Water, Construction
  • LOCATION: Maroon

This project involved the upgrade of both the Maroon and Moogerah Dams for Seqwater to improve flood security and address a number of dam safety concerns raised during dam safety reviews that had been conducted on the dams.

READ MORE
Melbourne Tram Track Renewal

Melbourne Tram Track Renewal

  • SECTOR: Rail, Construction
  • LOCATION: Melbourne

Fulton Hogan’s expertise in rail infrastructure construction and maintenance was applied to the renewal of 920 metres of double tram tracks on Melbourne’s iconic tram network.

READ MORE
Midlands Highway – Epping Forest to Powranna

Midlands Highway – Epping Forest to Powranna

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Powranna

This project entails upgrading the highway to a 2 + 1 configuration between Belle Vue Road at Epping Forest and Powranna Road at Powranna (approximately 11km).

READ MORE
Monash Freeway Upgrade

Monash Freeway Upgrade

  • SECTOR: Roads & Bridges, Construction, Surfacing
  • LOCATION: Melbourne

This project’s key features included 30km of extra traffic lanes along with major improvements to the managed motorway system.

READ MORE
National Aircraft Pavement Maintenance Programme 2014 – 2020

National Aircraft Pavement Maintenance Programme 2014 – 2020

  • SECTOR: Defence, Airports, Construction, Asset Management
  • LOCATION: Australia

Fulton Hogan was re-engaged by the Department of Defence to perform various critical maintenance activities at military airfields across Australia for a further six years to 2020.

READ MORE
NBN South Australia Packages

NBN South Australia Packages

  • SECTOR: Communications, Construction
  • LOCATION: Adelaide

Fulton Hogan is rolling-out multiple packages of FSAM (Fibre Servicing Area Modules) for the National Broadband Network (NBN) across Adelaide.

READ MORE
New Airside Hardstand Construction

New Airside Hardstand Construction

  • SECTOR: Airports, Construction
  • LOCATION: Auckland

Auckland Airport, the third busiest in Australasia, has experienced strong growth over the past five years. A continued forecast for growth in 2015 meant it urgently required a new hardstand for international aircraft.

READ MORE
New Brighton Pier

New Brighton Pier

  • SECTOR: Roads & Bridges, Construction, Ports
  • LOCATION: Christchurch

An 18 month long complex civil construction project was completed by Fulton Hogan in June 2018 with the repair and strengthening of New Brighton Pier.

READ MORE
New Plymouth Wastewater Treatment Plant Upgrade

New Plymouth Wastewater Treatment Plant Upgrade

  • SECTOR: Water, Construction
  • LOCATION: North Island

Fulton Hogan used cutting-edge technology when appointed to carry out a recent stage of the New Plymouth Wastewater Treatment plant upgrade.

READ MORE
North Eastern Project Alliance

North Eastern Project Alliance

  • SECTOR: Rail, Construction
  • LOCATION: Rosanna

An Alliance has been formed between Fulton Hogan, Laing O’Rouke and Jacobs to deliver a program of works for the Level Crossing Removal Authority (LXRA).

READ MORE
North Island Cable Enhancement 4 (NICE4)

North Island Cable Enhancement 4 (NICE4)

  • SECTOR: Rail, Construction
  • LOCATION: Waikato

At Fulton Hogan, our international infrastructure specialists are known for our collaborative approach.

READ MORE
Northern Corridor Improvements (NCI)

Northern Corridor Improvements (NCI)

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Auckland

Fulton Hogan has formed an alliance with the NZ Transport Agency, HEB Construction, Opus and Jacobs to deliver the $700 million Northern Corridor Improvements project.

READ MORE
Northland Bridges – Matakohe & Taipa

Northland Bridges – Matakohe & Taipa

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Northland

Fulton Hogan is constructing three new double lane bridges – two in Matakohe and one in Taipa- as part of the Government’s Northland Bridges programme.

READ MORE
Peculiar Knob Haul Road

Peculiar Knob Haul Road

  • SECTOR: Resources, Construction, Roads & Bridges
  • LOCATION: Peculiar Knob

The client was experiencing a major problem with its 100km dirt haul road leading to its Peculiar Knob iron ore mine – it was unsafe and virtually unusable in wet conditions and had to be regularly graded.

READ MORE
Port Botany Redevelopment

Port Botany Redevelopment

  • SECTOR: Ports, Construction
  • LOCATION: Sydney

Port Botany, now Australia’s largest container port, is a major commercial area, with multiple terminals. It is serviced by both road and rail, with the international and domestic airports nearby.

READ MORE
Project Florence – Fonterra Wastewater Treatment Plant

Project Florence – Fonterra Wastewater Treatment Plant

  • SECTOR: Water, Construction
  • LOCATION: Waikato

When Fonterra was building its new milk powder plant in the Waikato, Fulton Hogan was brought in to construct a $20 million wastewater treatment plant.

READ MORE
Project Lift, Gold Coast Airport

Project Lift, Gold Coast Airport

  • SECTOR: Airports, Construction
  • LOCATION: Gold Coast

Fulton Hogan drew on its vast experience in this sector to complete this complex project in time for the 2018 Gold Coast Commonwealth Games.

READ MORE
Pukekohe Wastewater Treatment Plant Upgrade

Pukekohe Wastewater Treatment Plant Upgrade

  • SECTOR: Water, Construction
  • LOCATION: Pukekohe

Fulton Hogan carried out a $39 million upgrade to the Pukekohe Wastewater Treatment Plant to prepare for future population growth.

READ MORE
RAAF Pearce & Gin Gin Overlays

RAAF Pearce & Gin Gin Overlays

  • SECTOR: Defence, Airports, Construction
  • LOCATION: Perth

Fulton overlaid the runways and taxiways at RAAF Base Pearce and RAAF Base Gin Gin north of Perth for the Department of Defence.

READ MORE
Riccarton Road upgrade

Riccarton Road upgrade

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Christchurch

Upgrade of a section of Riccarton Road – one of Christchurch’s busiest road corridors. This project involved the replacement of more than 3400 metres of watermain, wastewater and stormwater piping, resurfacing 8000 square metres of pavement and installing new streetscaping. This challenging project included more than 1000 metres of wastewater pipes replacement at four metres, […]

READ MORE
SH36 Pedestrian Overbridge (Matarawa Pa overbridge)

SH36 Pedestrian Overbridge (Matarawa Pa overbridge)

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Tauranga

This project involved the supply and installation of a pedestrian footbridge over State Highway 36 in Tauranga, including piers, abutments, concrete walkway, swales, a 10m footbridge on the east side and other associated structural works. The bridge was a 38.3m steel frame truss with GEOTUB modular 900mm columns and 1200mm dia columns using steel column […]

READ MORE
South East Water Pipeline & Structures Program

South East Water Pipeline & Structures Program

  • SECTOR: Water, Construction
  • LOCATION: Melbourne

South East Water is a Melbourne metropolitan retail supplier, delivering potable water, recycled water and removing and managing wastewater from some 1.6 million people across their 3,640 km² network.

READ MORE
South West & Great Western Integrated Services Arrangement

South West & Great Western Integrated Services Arrangement

  • SECTOR: Roads & Bridges, Construction, Asset Management, Surfacing
  • LOCATION: Bunbury

Fulton Hogan’s Integrated Service Agreement (ISA) with Main Roads Western Australia is an example of how we provide infrastructure management services on a long-term basis.

READ MORE
Southern Apron Expansion (SEA), Tullamarine Airport

Southern Apron Expansion (SEA), Tullamarine Airport

  • SECTOR: Airports, Construction
  • LOCATION: Melbourne

This project extended Fulton Hogan’s long-standing involvement at Tullamarine Airport. It was divided into two main areas of work, the Southern Apron Expansion and the Sierra Apron Infill.

READ MORE
Taramakau Bridge

Taramakau Bridge

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Greymouth

Fulton Hogan completed this 250 metre long bridge six months before the expected completion date, providing long-awaited travel improvements for drivers, cyclists and pedestrians.

READ MORE
Taxiway Alpha Widening & Strengthening

Taxiway Alpha Widening & Strengthening

  • SECTOR: Airports, Construction
  • LOCATION: Christchurch

Christchurch International Airport continues to grow its position as New Zealand’s South Island hub. With the introduction of Airbus A380 aircraft, widening Taxiway Alpha in front of the terminal was required.

READ MORE
Taxiway Lima

Taxiway Lima

  • SECTOR: Airports, Construction, Surfacing
  • LOCATION: Auckland

Auckland International Airport needed a new taxiway to accommodate the Airbus A380 aircraft, as well as reduce aircraft congestion and delays and improve safety at times of low visibility. Once constructed, this 600m-long 60m-wide taxiway doubled aircraft access from the busy international terminal to the main runway. Using Fulton Hogan’s multi-disciplinary engineering capabilities, the runway […]

READ MORE
Toorak Road West Tram Extension

Toorak Road West Tram Extension

  • SECTOR: Rail, Construction
  • LOCATION: Melbourne

As part of Melbourne Metro Tunnel enabling works, the Route 58 tram service which previously travelled along Domain Road and Park Street, South Yarra, was re-routed to Toorak Road West.

READ MORE
Waimea Community Dam

Waimea Community Dam

  • SECTOR: Construction
  • LOCATION: Nelson

Fulton Hogan is joint venturing with Taylors Contracting on the Waimea Community Dam. A three-year project in the Lee Valley, 36km south-west of Nelson. The client, Waimea Water Ltd, is a joint venture between Tasman District Council and Waimea Irrigators Ltd. The dam is being developed after multiple droughts in the region over the past […]

READ MORE
Wellington International Airport Taxiway A Widening & Surfacing

Wellington International Airport Taxiway A Widening & Surfacing

  • SECTOR: Airports, Construction
  • LOCATION: Wellington

Recycling was an important focus during our work on the widening and resurfacing of Taxiway A at Wellington International Airport.

READ MORE
WestConnex – Operate & Maintain

WestConnex – Operate & Maintain

  • SECTOR: Roads & Bridges, Construction, Asset Management
  • LOCATION: Sydney

WestConnex is the largest transport and urban renewal project in Australia and is a critical part of the NSW Government’s integrated transport solution, providing public transport and road infrastructure to ease congestion and keep Sydney moving.  The Fulton Hogan Egis Joint Venture is responsible for the maintenance and operation of the motorway network including:  Pavements  […]

READ MORE
Western Belfast Bypass

Western Belfast Bypass

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Christchurch

Part of the New Zealand roads of national significance programme, the Western Belfast Bypass project involved the construction of a new 5km, four-lane, median separated motorway to provide a direct connection between the Christchurch northern motorway and Johns Road. This project, which brought together a range of skills and experience from throughout Fulton Hogan, established […]

READ MORE
White Rock Wind Farm

White Rock Wind Farm

  • SECTOR: Energy, Construction
  • LOCATION: Northern New South Wales

Fulton Hogan worked with Goldwind to deliver a 175MW project near Glen Innes in the Northern Tablelands, New South Wales – a first for the business in this expanding area of the energy market.

READ MORE
Whitsunday Coast Airport Runway Upgrade

Whitsunday Coast Airport Runway Upgrade

  • SECTOR: Airports, Construction, Surfacing
  • LOCATION: Whitsunday

Whitsunday Coast Airport was the first project in Australia to achieve a zero waste status thanks to the innovative approach adopted by Fulton Hogan and the Council that saw the 2.1km runways upgrade at night, while planes still landed by day.

READ MORE
Widening of Portobello Road

Widening of Portobello Road

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Otago

Fulton Hogan is working on widening and raising the road between Broad Bay and Portobello as part of the Peninsula Connection project.

READ MORE
Wynyard Quarter Pump Station

Wynyard Quarter Pump Station

  • SECTOR: Water, Construction
  • LOCATION: Auckland

Wynyard Quarter Pump Station is a critical asset required by Watercare to manage the wastewater generated by the extensive development in the Wynyard Quarter. The primary purpose of this project was to create a deep wet-well pumping station and 24 hour storage capacity for wastewater. The pump station required a control room to house the […]

READ MORE