KiwiRail Bridge 7
- SECTOR: Rail, Roads & Bridges
- LOCATION: Christchurch
Replacement of a timber, twin bridge with a four span steel bridge including: • Bored piles 24m deep 1000mm in diameter • Insitu concrete head stocks • One abutment was pre cast, installed during a weekend block of line and one abutment was poured insitu • The existing bridges were demolished and new Steel Plate […]
READ MOREBayswater Level Crossing Removal
- SECTOR: Rail, Construction
- LOCATION: Melbourne
As part of Victoria’s Level Crossing Removal Program (LCRP), Fulton Hogan (with Laing O’Rourke and AECOM, in an alliance with Public Transport Victoria, Metro Trains Melbourne and VicRoads) undertook the removal of two grade separations at Mountain Highway and Scoresby Road in Melbourne’s outer east.
READ MOREKaikōura Emergency Works
- SECTOR: Rail, Construction
- LOCATION: Kaikōura
At Fulton Hogan, our international infrastructure specialists are known for our collaborative approach.
READ MOREKaimai Tunnel
- SECTOR: Rail, Construction
- LOCATION: Bay of Plenty
At Fulton Hogan, our international infrastructure specialists are known for our collaborative approach.
READ MOREFitzgerald Road, Ardeer and Robinsons Road, Deer Park – Level Crossing Removal
- SECTOR: Roads & Bridges, Rail, Construction
- LOCATION: Melbourne
Works have commenced to remove the dangerous and congested level crossings at Fitzgerald Road in Ardeer and Robinsons Road in Deer Park. These works will be delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, V/Line, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). The Robinsons Road […]
READ MOREClyde Road, Berwick – Level Crossing Removal
- SECTOR: Rail, Roads & Bridges, Construction
- LOCATION: Melbourne
The level crossing at Clyde Road, Berwick is being removed by building a road underpass beneath the rail line. These works are being delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). The project will also deliver an upgraded […]
READ MORESouth Gippsland Highway– Level Crossing Removal
- SECTOR: Roads & Bridges, Rail, Construction
- LOCATION: Melbourne
The South Gippsland Highway, Dandenong South level crossing has been removed with a road bridge over the rail line opening months ahead of schedule in August 2021. This project was delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). […]
READ MORECardinia Road, Pakenham – Level Crossing Removal
- SECTOR: Roads & Bridges, Rail, Construction
- LOCATION: Melbourne
The level crossing at Cardinia Road, Pakenham was removed in December 2020, with traffic now safely travelling over the new road bridge. These works were delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). More than 23,000 vehicles travelled […]
READ MOREEvans Road, Lyndhurst – Level Crossing Removal
- SECTOR: Rail, Roads & Bridges, Construction
- LOCATION: Melbourne
The level crossing at Evans Road, Lyndhurst was removed in October 2020 and replaced with a new road bridge. These works were delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). The project scope included: Constructing a shared use […]
READ MOREInland Rail Section 5: Parkes to Narromine (P2N)
- SECTOR: Rail
- LOCATION: Parkes, NSW
The Parkes to Narromine (P2N) section was the first of 13 sections on the Inland Rail Program to be completed. The P2N project involved upgrading 98.4km of existing rail track and construction of 5.3km of new rail near Parkes. Included in the project was the demolition of all existing infrastructure and a full rebuild of […]
READ MOREMelbourne Tram Track Renewal
- SECTOR: Rail, Construction
- LOCATION: Melbourne
Fulton Hogan’s expertise in rail infrastructure construction and maintenance was applied to the renewal of 920 metres of double tram tracks on Melbourne’s iconic tram network.
READ MORENorth Eastern Project Alliance
- SECTOR: Rail, Construction
- LOCATION: Rosanna
An Alliance has been formed between Fulton Hogan, Laing O’Rouke and Jacobs to deliver a program of works for the Level Crossing Removal Authority (LXRA).
READ MORENorth Island Cable Enhancement 4 (NICE4)
- SECTOR: Rail, Construction
- LOCATION: Waikato
At Fulton Hogan, our international infrastructure specialists are known for our collaborative approach.
READ MOREToorak Road West Tram Extension
- SECTOR: Rail, Construction
- LOCATION: Melbourne
As part of Melbourne Metro Tunnel enabling works, the Route 58 tram service which previously travelled along Domain Road and Park Street, South Yarra, was re-routed to Toorak Road West.
READ MORE