Boondooma Dam

The spillway repairs project strengthened the existing spillway chute at Boondooma Dam. The scope included installing anchors in the existing spillway chute, concrete lining the spillway walls and earthworks to stabilise the right hand side of the spillway wall.
It also included:
  • Dewatering plunge pool average 8m in depth prior to works commencing, the removal and
  • relocation, in the dam and surrounding area, of all flora and fauna found
  • Filling of plunge pool to create access ramp with 40,000m3 of site won material.
  • Drill and blast approx. 55,000m3 of rock
  • Excavate and remove approx. 110,000m3 to stockpile
  • Drill and Install rock anchors (15,000m) ranging in size from 32mm dia to 75mm dia and
  • from 6m to 24m in length.
  • The FRP of approx. 5,500m3 of concrete to spillway chute floor and walls
  • FRP of concrete access road (2,850m2)
  • Associated drainage works including box culvert, concrete lined v-drains, rock drains
SHARE
LOCATION
Queensland
CLIENT
Sun Water
VALUE
A$14m
START
Nov 2016
END
Jna 2018
CAPABILITY
Water, Construction

You might also like...

Waiari Water Treatment Plant

Waiari Water Treatment Plant

  • SECTOR: Water
  • LOCATION: Tauranga

The Waiāri Water Supply Scheme involves developing a water abstraction facility on the Waiāri Stream, a water treatment plant in No.1 Road, Te Puke, and...

READ MORE
Naseby Waste Water Filtration Beds

Naseby Waste Water Filtration Beds

  • SECTOR: Water
  • LOCATION: Central Otago

Fulton Hogan were engaged by Central Otago District Council to construct new wastewater filtration beds in the township of Naseby. The innovative design by Stantec...

READ MORE
Lyttelton Wastewater Work Package 4

Lyttelton Wastewater Work Package 4

  • SECTOR: Water
  • LOCATION: Christchurch

Installation of 4.5 kilometre of wastewater pipeline connecting to the Lyttelton Harbour’s wastewater to an existing pump station (Pump Station 15) in Woolston's Alport Place....

READ MORE
Pukekohe East Reservoir

Pukekohe East Reservoir

  • SECTOR: Water
  • LOCATION: Auckland

Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.  

READ MORE
Lyttelton Pump Stations

Lyttelton Pump Stations

  • SECTOR: Water
  • LOCATION: Christchurch

The Wastewater Lyttleton Project - Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to...

READ MORE