Collaborative working – Pipelines (Sewerage and Drainage) Program Alliance

The Pipelines (Sewerage and Drainage) Program Alliance was formed to design and construct new and replacement drainage and flood mitigation, sewerage transfer and drainage infrastructure works for Melbourne Water. The program ran in alliance with Fulton Hogan, Jaydo Construction, GHD and Melbourne Water. The Pipeline Alliance was responsible for the design and construction of over 30 projects within a five year program of works, allowing the Pipeline Alliance to work closely with the project initiators to determine the optimum solutions to satisfy the functional requirements.

Fulton Hogan was responsible for the construction, commissioning and handover of projects within the Program. Some of the projects included:

  • $43 million 3m diameter pipe-jacked stormwater tunnel
  • $23 million incrementally launched sewerage aqueduct
  • $12 million Class C recycled water pipeline
  • $7 million reconstruction of stormwater beach outlets
  • $2.5 million sewerage emergency relief structure
  • $0.5 million odour control plants.
SHARE
LOCATION Metropolitan Melbourne, Victoria CLIENT Melbourne Water VALUE AU $165M START 2008 END May 2013 CAPABILITY Water, new and replacement drainage and flood mitigation, sewerage transfer and drainage infrastructure    

You might also like...

Waiari Water Treatment Plant

Waiari Water Treatment Plant

  • SECTOR: Water
  • LOCATION: Tauranga

The Waiāri Water Supply Scheme involves developing a water abstraction facility on the Waiāri Stream, a water treatment plant in No.1 Road, Te Puke, and...

READ MORE
Naseby Waste Water Filtration Beds

Naseby Waste Water Filtration Beds

  • SECTOR: Water
  • LOCATION: Central Otago

Fulton Hogan were engaged by Central Otago District Council to construct new wastewater filtration beds in the township of Naseby. The innovative design by Stantec...

READ MORE
Lyttelton Wastewater Work Package 4

Lyttelton Wastewater Work Package 4

  • SECTOR: Water
  • LOCATION: Christchurch

Installation of 4.5 kilometre of wastewater pipeline connecting to the Lyttelton Harbour’s wastewater to an existing pump station (Pump Station 15) in Woolston's Alport Place....

READ MORE
Pukekohe East Reservoir

Pukekohe East Reservoir

  • SECTOR: Water
  • LOCATION: Auckland

Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.  

READ MORE
Lyttelton Pump Stations

Lyttelton Pump Stations

  • SECTOR: Water
  • LOCATION: Christchurch

The Wastewater Lyttleton Project - Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to...