Dunedin City Council – SP8
Dunedin City Council have been widening parts of Portobello Road since the early 2000’s. This is primarily to create space for pedestrians and cyclists with additional width and realignment for road user safety.
The project consists of 16 separable portions, (SP’s), making it the largest roading package ever contracted by the Council. As this is one of two key tourist routes the project was a priority for the Council.
In April 2018 Fulton Hogan established on site at SP8, the first section to progress. The project consisted of bulk fill, rock sea wall (hand stacked), raising the road level to future proof against sea level rise, road widening from 6.5m to 11m, drainage improvements, surfacing works, line marking, pump station upgrades, installation of kerb blocks to create a separate shared path, and landscaping. The total length of the site was 2.6 kilometres.
Summary of the works
- Traffic management
- Site clearance
- 9,000m2 seawall
- 3,500m3 cut to waste
- 47,000m3 bulk fill
- Stormwater improvements and modifications
- Subsoil drainage
- Service adjustments
- Utilities Works including; trenches and modifications, street lighting works.
- Pump stations – one New and three modified.
- 30,000m2 Pavements
- Structures including seven sets of precast stairs, a new boat shed, safety barriers and separators, landscaping, signage, roadmarking, miscellaneous structures including bus shelters, seats, a concrete boat ramp etc,
SHARE
You might also like...
Mount Ousley interchange
- SECTOR: Roads & Bridges
- LOCATION: Wollongong
The interchange will replace the existing intersection of the Princes Motorway and Mount Ousley Road, improving connectivity, safety and efficiency to those travelling through the...
READ MOREAsphalting for Spirit of Tasmania’s New Quay in Geelong
- SECTOR: Ports, Roads & Bridges, Surfacing
- LOCATION: Corio Quay, north of Geelong
Construction of Spirit of Tasmania Quay in Corio, located north of Geelong, involved extensive construction works. It included rehabilitation works along Corio Quay Road, construction...
READ MOREKiwiRail Bridge 7
- SECTOR: Rail, Roads & Bridges
- LOCATION: Christchurch
Replacement of a timber, twin bridge with a four span steel bridge including: • Bored piles 24m deep 1000mm in diameter • Insitu concrete head...
READ MORENorth Frame Pedestrian Bridge
- SECTOR: Roads & Bridges
- LOCATION: Christchurch
The North Frame Pedestrian Footbridge will span 32m across the Avon River in Central Christchurch, playing a key role in the total pedestrian experience of...
READ MOREHallam Bypass
- SECTOR: Roads & Bridges, Construction
- LOCATION: Dandenong, Victoria
VicRoads awarded FRH Projects (now Fulton Hogan) three of the six contracts on the Hallam Bypass. Two of these contracts involved the design and construction...
READ MORE