Glendowie Branch Trunk Sewer Upgrade
Fulton Hogan is carrying out the construction of the new 1km long x DN2100 storage tunnel. This includes a new 17m deep wastewater pumping station, six further manhole chambers along the main alignment, a new overflow structure, upgrades and connections to the live wastewater network. Additionally to this Fulton Hogan are demolishing the redundant infrastructure.
The new pipe travels from a new pump station in Maybury Reserve, up Elstree Avenue and then along part of Taniwha Street. To install the pipe we are using a tunnel boring machine (TBM) which digs tunnels deep beneath the ground. The TBM is lowered nine-metre-deep hole, and then tunnels to the next site, of which we have six in total.
SHAREYou might also like...
Waiari Water Treatment Plant
- SECTOR: Water
- LOCATION: Tauranga
The Waiāri Water Supply Scheme involves developing a water abstraction facility on the Waiāri Stream, a water treatment plant in No.1 Road, Te Puke, and...
READ MORENaseby Waste Water Filtration Beds
- SECTOR: Water
- LOCATION: Central Otago
Fulton Hogan were engaged by Central Otago District Council to construct new wastewater filtration beds in the township of Naseby. The innovative design by Stantec...
READ MORELyttelton Wastewater Work Package 4
- SECTOR: Water
- LOCATION: Christchurch
Installation of 4.5 kilometre of wastewater pipeline connecting to the Lyttelton Harbour’s wastewater to an existing pump station (Pump Station 15) in Woolston's Alport Place....
READ MOREPukekohe East Reservoir
- SECTOR: Water
- LOCATION: Auckland
Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.
READ MORELyttelton Pump Stations
- SECTOR: Water
- LOCATION: Christchurch
The Wastewater Lyttleton Project - Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to...
READ MORE