fbpx

Mahinerangi Wind Farm

Fulton Hogan operates its own Heavy Haulage division that specialises in transporting large loads to difficult-to-access sites.
With proven expertise in handling, storage and transport of equipment and materials, we can coordinate the logistics and provide transport solutions for the most challenging loads.

For the Mahinerangi Wind Farm, near Dunedin, our diverse fleet of specialised equipment and heavy haulage professionals successfully transported 12 V90 Vestas Towers to the site on behalf of our client, Trustpower.

Work included surveying and designing the route, a comprehensive transport management plan, obtaining all roading authority permits, liaising with the shipping agent and collection from Port Chalmers, transporting and oversize load piloting, bridge supervision and organising cranes for unloading at the construction site.

SHARE
LOCATION Dunedin CLIENT Trustpower DATE January 2011 CAPABILITY Energy, Construction, Transport

You might also like...

Bulgana Wind Farm Balance Of Plant

Bulgana Wind Farm Balance Of Plant

  • SECTOR: Energy, Construction
  • LOCATION: Bulgana, Victoria

The 56 turbine wind farm spans over a 7,524-hectare site, which includes public roadsides and 14 private properties. It will generate 194MW of clean, renewable...

READ MORE
Civil Works – Australia Pacific LNG

Civil Works – Australia Pacific LNG

  • SECTOR: Resources, Construction, Ports, Energy
  • LOCATION: Curtis Island

Fulton Hogan’s experience in earthmoving and civil construction was pivotal in meeting the challenges of the earthworks associated with a multi-billion dollar liquefied natural gas...

READ MORE
White Rock Wind Farm

White Rock Wind Farm

  • SECTOR: Energy, Construction
  • LOCATION: Northern New South Wales

Fulton Hogan worked with Goldwind to deliver a 175MW project near Glen Innes in the Northern Tablelands, New South Wales – a first for the...

READ MORE
KUPE Gas Onshore Production Station Upgrade

KUPE Gas Onshore Production Station Upgrade

  • SECTOR: Energy, Construction
  • LOCATION: North Island

The KUPE facility is a gas condensate field, located in the Taranaki basin, 30km off the west coast of New Zealand’s North Island. This infrastructure...

READ MORE
Arthurs Lake Hydro

Arthurs Lake Hydro

  • SECTOR: Energy, Construction
  • LOCATION: Midlands

The Arthurs Lake Hydro Project was part of the Midlands Irrigation Scheme - Tasmania’s largest-ever infrastructure project. It was designed to supply 38,500ML of water...

READ MORE