M&E – Metro Mechanical and Electrical Framework

The Metro Mechanical and Electrical Framework includes design and construction of approximately 50 individual projects requiring mechanical and electrical renewal works, on assets such as pump stations, pressure reducing valves stations, rising mains and dosing stations that are located in the Adelaide metropolitan area and surrounding rural areas to south and north of the city.

These projects consist of the design, construct, installation and commissioning of 100 pump stations (up to 22kW) around the Adelaide metropolitan area as part of a program of works. Additionally, there are a number of larger (up to 55 kW) pump stations also included in the Framework. A summary of projects include:

  • Smart Networks (Flowmeters, Pressure Sensors and Customer Meters)
  • Potable Water Valve & Flow Meter Replacements (Large Bore)
  • Metro Wastewater Pump Station Rehabilitation and/or relocation
  • Granulated Activated Carbon Plants (Containerised Units, multiple locations)
  • Blackwood PRV Upgrade
SHARE
LOCATION Metropolitan Adelaide, South Australia CLIENT SA Water VALUE AU$20m START 2016 END 2020 CAPABILITY Water, Electrical, Mechanical, Instrumentation Controls and Automation            

You might also like...

Waiari Water Treatment Plant

Waiari Water Treatment Plant

  • SECTOR: Water
  • LOCATION: Tauranga

The Waiāri Water Supply Scheme involves developing a water abstraction facility on the Waiāri Stream, a water treatment plant in No.1 Road, Te Puke, and...

READ MORE
Naseby Waste Water Filtration Beds

Naseby Waste Water Filtration Beds

  • SECTOR: Water
  • LOCATION: Central Otago

Fulton Hogan were engaged by Central Otago District Council to construct new wastewater filtration beds in the township of Naseby. The innovative design by Stantec...

READ MORE
Lyttelton Wastewater Work Package 4

Lyttelton Wastewater Work Package 4

  • SECTOR: Water
  • LOCATION: Christchurch

Installation of 4.5 kilometre of wastewater pipeline connecting to the Lyttelton Harbour’s wastewater to an existing pump station (Pump Station 15) in Woolston's Alport Place....

READ MORE
Pukekohe East Reservoir

Pukekohe East Reservoir

  • SECTOR: Water
  • LOCATION: Auckland

Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.  

READ MORE
Lyttelton Pump Stations

Lyttelton Pump Stations

  • SECTOR: Water
  • LOCATION: Christchurch

The Wastewater Lyttleton Project - Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to...

READ MORE