Wastewater – Glenelg Wastewater Treatment Plant Inlet Screens & Anderson Ave Pump Station

The D&C upgrade and rehabilitation of the WWTP was delivered as an ECI model to allow review and selection of the most appropriate equipment and construction methodologies and was delivered in two separable portions as follows:

Glenelg WWTP Inlet Works (greenfields site adjacent to existing WWTP)

  • Bulk earthworks and retaining wall construction
  • Concrete structures construction
  • Tanks concrete rehabilitation
  • Concrete structures remediation
  • Redundant structures demolition
  • Design, supply & installation of:
    • inlet screening train
    • grit removal and classification system
    • odour control plant

Anderson Ave WWPS Upgrade (brownfields site within existing pump station):

  • Bypass pumps installation
  • Wet well rehabilitation
  • Redundant infrastructure demolition
  • Design, supply & installation of:
    • pumps and pipework
    • switchboards and control panels
    • WWPS dual power supply
  • Existing structure remediation
  • Redundant equipment decommissioning
  • New overhead gantry crane supply and installation
SHARE
LOCATION Glenelg, South Australia CLIENT SA Water VALUE AU$20m START Dec 2014 END Jun 2016 CAPABILITY Water, Civil, Earthworks, Structures, Precast, Structures, Electrical, Mechanical, Switchboards, Instrumentation Controls and Automation.

You might also like...

Waiari Water Treatment Plant

Waiari Water Treatment Plant

  • SECTOR: Water
  • LOCATION: Tauranga

The Waiāri Water Supply Scheme involves developing a water abstraction facility on the Waiāri Stream, a water treatment plant in No.1 Road, Te Puke, and...

READ MORE
Naseby Waste Water Filtration Beds

Naseby Waste Water Filtration Beds

  • SECTOR: Water
  • LOCATION: Central Otago

Fulton Hogan were engaged by Central Otago District Council to construct new wastewater filtration beds in the township of Naseby. The innovative design by Stantec...

READ MORE
Lyttelton Wastewater Work Package 4

Lyttelton Wastewater Work Package 4

  • SECTOR: Water
  • LOCATION: Christchurch

Installation of 4.5 kilometre of wastewater pipeline connecting to the Lyttelton Harbour’s wastewater to an existing pump station (Pump Station 15) in Woolston's Alport Place....

READ MORE
Pukekohe East Reservoir

Pukekohe East Reservoir

  • SECTOR: Water
  • LOCATION: Auckland

Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.  

READ MORE
Lyttelton Pump Stations

Lyttelton Pump Stations

  • SECTOR: Water
  • LOCATION: Christchurch

The Wastewater Lyttleton Project - Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to...