Water Supply – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

The Hackney Road project section involved 2.2km of pipe relining, underboring, and complete replacement of various sections of pipeline. The pipe alignment ran through the East Parklands and crossed cultural and state heritage sites, requiring extensive stakeholder management and employing hydro-excavation methodologies to ensure significant tree protection during construction.

The North East Road project section involved over 20 cross connections from a redundant water main to a new main extending 11km from Hope Valley Reservoir to the Gilberton Pump Station along another major arterial road. As a result of the existing network design, some connections were done as a live tap, where a new connection was made onto a live and operating water main.

Additional packages were also added to the project included sewer pipe laying installation works, excavation and contaminated soil disposal, manhole installation, tie in points and grout filling works of redundant sections of sewer main and manholes.

SHARE
LOCATION Adelaide, South Australia CLIENT SA Water VALUE AU$8m START JUL 2015 END Nov 2016 CAPABILITY Water, Civil, Pipelines, Excavation, Cultural and Vegetative Heritage    

You might also like...

Waiari Water Treatment Plant

Waiari Water Treatment Plant

  • SECTOR: Water
  • LOCATION: Tauranga

The Waiāri Water Supply Scheme involves developing a water abstraction facility on the Waiāri Stream, a water treatment plant in No.1 Road, Te Puke, and...

READ MORE
Naseby Waste Water Filtration Beds

Naseby Waste Water Filtration Beds

  • SECTOR: Water
  • LOCATION: Central Otago

Fulton Hogan were engaged by Central Otago District Council to construct new wastewater filtration beds in the township of Naseby. The innovative design by Stantec...

READ MORE
Lyttelton Wastewater Work Package 4

Lyttelton Wastewater Work Package 4

  • SECTOR: Water
  • LOCATION: Christchurch

Installation of 4.5 kilometre of wastewater pipeline connecting to the Lyttelton Harbour’s wastewater to an existing pump station (Pump Station 15) in Woolston's Alport Place....

READ MORE
Pukekohe East Reservoir

Pukekohe East Reservoir

  • SECTOR: Water
  • LOCATION: Auckland

Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.  

READ MORE
Lyttelton Pump Stations

Lyttelton Pump Stations

  • SECTOR: Water
  • LOCATION: Christchurch

The Wastewater Lyttleton Project - Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to...

READ MORE