fbpx

Wynyard Quarter Pump Station

Wynyard Quarter Pump Station is a critical asset required by Watercare to manage the wastewater generated by the extensive development in the Wynyard Quarter.

The primary purpose of this project was to create a deep wet-well pumping station and 24 hour storage capacity for wastewater. The pump station required a control room to house the electrical equipment and act as the control centre.

Due to the architectural revitalisation of the Wynyard Quarter area, the traditional green block building was not acceptable. The control building was designed to compliment the surrounding environment.

The result was a 12m tall irregular semi egg shaped tank-like structure that housed public toilets on the lower level, the pump station electrical and control equipment on the second level, and a rooftop area that is available for occasional events. The main wet well pump station and storage tank is a 10m diameter 14m deep circular structure which is completely buried. Inside this are two pumps, a duty and a standby, as well as a separate valve chamber and storage chamber with electrically actuated valving to control and manage wastewater flows as required.

Not one single line of symmetry exists in the plan view of the control building, the parapet appears to have been sliced off at an angle, and the finish is roughsawn timber. A very unique and original building.

Winner of the Hirepool construction Excellence Award for projects up to $5M and the Monte Craven Architectural Award at the Concrete New Zealand Conference 2019

SHARE
Location: Auckland Client: Watercare Services Ltd Value:  NZ $4.5 million Start: November 2016 End: March 2018 Capability: Construction, Water

You might also like...

Waiari Water Treatment Plant

Waiari Water Treatment Plant

  • SECTOR: Water
  • LOCATION: Tauranga

The Waiāri Water Supply Scheme involves developing a water abstraction facility on the Waiāri Stream, a water treatment plant in No.1 Road, Te Puke, and...

READ MORE
Naseby Waste Water Filtration Beds

Naseby Waste Water Filtration Beds

  • SECTOR: Water
  • LOCATION: Central Otago

Fulton Hogan were engaged by Central Otago District Council to construct new wastewater filtration beds in the township of Naseby. The innovative design by Stantec...

READ MORE
Lyttelton Wastewater Work Package 4

Lyttelton Wastewater Work Package 4

  • SECTOR: Water
  • LOCATION: Christchurch

Installation of 4.5 kilometre of wastewater pipeline connecting to the Lyttelton Harbour’s wastewater to an existing pump station (Pump Station 15) in Woolston's Alport Place....

READ MORE
Pukekohe East Reservoir

Pukekohe East Reservoir

  • SECTOR: Water
  • LOCATION: Auckland

Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.  

READ MORE
Lyttelton Pump Stations

Lyttelton Pump Stations

  • SECTOR: Water
  • LOCATION: Christchurch

The Wastewater Lyttleton Project - Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to...

READ MORE